Partitions and dividers
Plasterboard, Fermacell, with integrated acoustic or thermal insulation.
Ideal for dividing a room, creating a dressing room or closing off a mezzanine.
Service
Partitions, false ceilings, plaster coatings, perimeter insulation. Plastering is the skeleton of a successful interior: it is the quality of this step that will determine the durability of your entire renovation.
Our approach
Assessing what can be kept, what must be redone, what can be transformed. Discussion of your objectives, structural constraints and realistic budget.
Item-by-item quote with a projected schedule. In renovation projects, I coordinate with other trades (electrician, plumber) so that phases follow on smoothly.
Removal of existing partitions, substrate preparation, waste disposal through the appropriate channels. Systematic protection of floors and areas not involved.
Plasterboard, Fermacell or traditional plaster partitions depending on use (acoustic, water-resistant, fire-resistant). Invisible joints, smooth coat, ready to receive paint or wallpaper.
Level and squareness check, finishes. Final clean-up, rubble disposal, spotless worksite handover.
Services
Plasterboard, Fermacell, with integrated acoustic or thermal insulation.
Ideal for dividing a room, creating a dressing room or closing off a mezzanine.
Concealing pipework, integrating indirect LED lighting or improving acoustic insulation.
Fire-resistant version possible between dwellings where required.
Insulation of cold walls from the inside.
Rock wool or polystyrene with moisture-resistant plasterboard depending on the rooms involved.
Plaster, lime, decorative coatings…
Perfect for older buildings or authentic finishes (character homes, renovated farmhouses, etc.).
Treatment of active (movement) or passive cracks.
Bridging, calico tape and repair coatings after substrate assessment.
From stripping old coatings through to handover "ready to paint".
Coordination with electrician and plumber included if required.
Before / after
Drag the handle to compare the plasterboard during coating and the final result.


Indicative pricing
Plastering costs vary greatly depending on scope. Here are some ranges to position your project.
60-80 CHF/m²
Single plasterboard partition, no special insulation, standard finishes.
75-110 CHF/m²
Complete false ceiling with acoustic insulation and recessed lighting provision.
110-180 CHF/m²
Demolition, partition rebuilding, ceilings, coatings, finishes ready to paint.
Depending on substrate condition and finishes. Coordination with other trades included in the quote.
Area
Frequently asked questions
For 80 m² with demolition, partitions, ceilings, electrical, plumbing and painting: 5 to 8 weeks on average. Excluding plumbing/electrical, the plastering + painting portion represents 2 to 3 weeks.
On worksites I manage from A to Z, yes. I have a network of reliable partners (electrician, plumber, tiler, parquet layer) in Valais. But you can also bring your own tradespeople — I adapt to the schedule.
For works limited to one room: yes. For a complete renovation: no. Floors are stripped, water may be cut, dust is inevitable despite protection. It is better to arrange temporary accommodation.
No, that is a specialised and regulated trade. But I can arrange the diagnosis and coordinate with a certified company if needed. Common in Valais for buildings from the 1960s–80s.
Yes, I offer wall cladding with rock wool or polystyrene depending on the available thickness and the desired R value. Compatible with Valaisan cantonal grants for energy renovation.