{{> _header-en}}

Service

Plastering and renovation: structure, insulate, beautify

Partitions, false ceilings, plaster coatings, perimeter insulation. Plastering is the skeleton of a successful interior: it is the quality of this step that will determine the durability of your entire renovation.

Our approach

5 steps to a controlled renovation

  1. 01

    Feasibility study

    Assessing what can be kept, what must be redone, what can be transformed. Discussion of your objectives, structural constraints and realistic budget.

  2. 02

    Detailed quote and schedule

    Item-by-item quote with a projected schedule. In renovation projects, I coordinate with other trades (electrician, plumber) so that phases follow on smoothly.

  3. 03

    Demolition and preparation

    Removal of existing partitions, substrate preparation, waste disposal through the appropriate channels. Systematic protection of floors and areas not involved.

  4. 04

    Installation and finishing

    Plasterboard, Fermacell or traditional plaster partitions depending on use (acoustic, water-resistant, fire-resistant). Invisible joints, smooth coat, ready to receive paint or wallpaper.

  5. 05

    Inspection and clean-up

    Level and squareness check, finishes. Final clean-up, rubble disposal, spotless worksite handover.

Services

The techniques I master

Partitions and dividers

Plasterboard, Fermacell, with integrated acoustic or thermal insulation.

Ideal for dividing a room, creating a dressing room or closing off a mezzanine.

False ceilings

Concealing pipework, integrating indirect LED lighting or improving acoustic insulation.

Fire-resistant version possible between dwellings where required.

Thermal cladding

Insulation of cold walls from the inside.

Rock wool or polystyrene with moisture-resistant plasterboard depending on the rooms involved.

Traditional plaster coatings

Plaster, lime, decorative coatings…

Perfect for older buildings or authentic finishes (character homes, renovated farmhouses, etc.).

Crack repairs

Treatment of active (movement) or passive cracks.

Bridging, calico tape and repair coatings after substrate assessment.

Complete renovation

From stripping old coatings through to handover "ready to paint".

Coordination with electrician and plumber included if required.

Before / after

Loft plastering · from installation to finish

Drag the handle to compare the plasterboard during coating and the final result.

After MNPro work: plastered loft, smooth finishes
Before work: ceiling and roof slopes in raw plaster
Before After

Indicative pricing

How much for your works?

Plastering costs vary greatly depending on scope. Here are some ranges to position your project.

Simple partition

60-80 CHF/m²

Single plasterboard partition, no special insulation, standard finishes.

Complete renovation

110-180 CHF/m²

Demolition, partition rebuilding, ceilings, coatings, finishes ready to paint.

Depending on substrate condition and finishes. Coordination with other trades included in the quote.

Frequently asked questions

Before starting the renovation

How long does a complete apartment renovation take?

For 80 m² with demolition, partitions, ceilings, electrical, plumbing and painting: 5 to 8 weeks on average. Excluding plumbing/electrical, the plastering + painting portion represents 2 to 3 weeks.

Do you coordinate other tradespeople?

On worksites I manage from A to Z, yes. I have a network of reliable partners (electrician, plumber, tiler, parquet layer) in Valais. But you can also bring your own tradespeople — I adapt to the schedule.

Can I live there during the works?

For works limited to one room: yes. For a complete renovation: no. Floors are stripped, water may be cut, dust is inevitable despite protection. It is better to arrange temporary accommodation.

Do you remove asbestos if any is found?

No, that is a specialised and regulated trade. But I can arrange the diagnosis and coordinate with a certified company if needed. Common in Valais for buildings from the 1960s–80s.

What about interior thermal insulation?

Yes, I offer wall cladding with rock wool or polystyrene depending on the available thickness and the desired R value. Compatible with Valaisan cantonal grants for energy renovation.

A renovation project?

Let's discuss it. Free visit, quote within 48h.

{{> _footer-en}} WhatsApp
Call Get a quote